PROJECT DURATION VALUE DESCRIPTION
SNEAKER FACTORY PROJECTS
POLOKWANE October 2019 R186 000.00 Strip out existing tenant installation
Re-construct to new tenant specifications
Ceilings,Tiling, Bulkheads/Drywalls,Painting
Shopfitting and finishes
Specialized discipline changes to suit new shop
configuration Electrical/Mechanical/Sprinklers
MALL OF THE SOUTH November 2019 R92 000.00 Strip out existing tenant installation
Re-construct to new tenant specifications
Ceilings,Tiling
Bulkheads/Drywalls,Painting
Shopfitting and Finishes
Specialized discipline changes to suit shop configuration
electrical,
mechanical, sprinklers
SAM NTHULI MALL November 2019   Strip out existing tenant installation
Re-construct to new tenant specifications
Ceilings,Tiling,Bulkheads/Drywalls
Painting
Shopfitting and Finishes
Specialized discipline changes to suit shop configuration
electrical, mechanical, sprinklers

MAMS MALL

November 2019

 

Strip out existing tenant installation
Re-construct to new tenant specifications
Ceilings,Tiling
Bulkheads/Drywalls,Painting
Shopfitting and Finishes
Specialized dicipline changes to suit shop configuration
electrical, mechanical, sprinklers

OMV PROJECTS

COOKE MINE June 2019 R2 200 000.00 Demolishing of existing filter plant including all sheeting,
side cladding, steelwork , total of 320 tons.
Removing, labeling and storing of specialized belts
& filtering equipment
SAINT GOBAINE August 2019 R1 800 000.00 Demolishing of existing filter plant, effluent plant,
pilot plant, modification and removal of
conveyor structures. Rerooting of main power supplies
Total of 200 tons

GLENCORE

August 2019

R1 800 000.00

 

Removal of electrical components and instrumentation
from redandant plant removal, transporting and
storing of dryer kiln, Total of 100 tons

WACO PROJECTS

SOLAR PANELS June 2019 - July 2019 R245 000.00

Strengthening existing roof strusses during normal
tenant operations to accommodate for additional
solar panels

CAT LADDER

June 2019 - July 2019

 

Installation of cat ladder exceeding 9m in length.

MOOIRIVIER MALL PROJECTS

    R4 563 727.55  
DISCHEM PH1 AND 2 April 2019 to August 2019   Strip out existing tenant installation
Re-construct to new tenant specifications
Ceilings
Tiling
Bulkheads/Drywalls
QUEENSPARK April 2019 to August 2019   Strip out existing tenant installation
Re-construct to new tenant specifications
Ceilings
Tiling
Bulkheads/Drywalls
Painting
Shopfitting and Finishes
Mechanical and Sprinklers installations
MILADYS April 2019 to August 2019   Strip out existing tenant installation
Re-construct to new tenant specifications
Ceilings
Tiling
Bulkheads/Drywalls
Painting
Shopfitting and Finishes
Mechanical and Sprinklers installations
WOOLWORTHS April 2019 to May 2019 R3 400 000.00 Strip out existing tenant installation
Re-construct to white box specifications
Glazing
Painting
Tiling
Bulkheads/Drywalls
Wet works
Shopfitting and finishes
(all work completed during trading hours)

NAMPO CRI PUMPS

March 2019 to April 2019

R596 000.00

Conversion of an open shed into a display stall
Extention of roofs
Sheeting and Timber Walls
Flooring
Ceilings
Electrical Work
Plumbing Work
Display feature

NEWTOWN PROJECTS

    R17 000 000.00  
JHC August 2019 to September 2019   Strip out existing tenant installation
Re-construct to new tenant specifications
Glazing
Painting
Bulkheads/Drywalls/Ceilings
Wet Works
Tiling
Plumbing Work
Electrical Work
Mechanical and Sprinklers installations
STUDIO April 2019 to May 2019   Strip out existing tenant installation
Re-construct to new tenant specifications
Brickwork
Glazing
Painting
Bulkheads/Drywalls
Wet works
Tiling
Specialized handrailing and staircase
Plumbing work
Electrical work
Mechanical and Sprinklers installations
MAJESTIC OFFICE December 2018 to February 2019   1700m2 Shopfitting
Bulkheads/Drywalls
Ceiling
Tiling
Glazing
Access Control
Plumbing work
Electrical work
Mechanical and Sprinklers Installations
SHOP 330
OLD HI-FI CORPORATION
GASS OFFICE
December 2018 to March 2019   Strip out existing Tenant installation
Re-construct to new tenant specifications
Brickwork
Glazing
Painting
Bulkheads/Drywalls
Wet works
Tiling
Mechanical and Sprinklers installations
MCDONALDS May 2018 to September 2018   Strip out existing Tenant Specifications
Re-construct to white box specifications
Structural and Sundry Steelwork
Glazing
Painting
Bulkheads/Drywalls
Wet works
External Works
Tiling
OLD MUTAL

October 2018 to November 2018

 

 

  Strip out existing tenant installation
Re-construct to white box specifications
Glazing
Painting
Bulkheads/Drywalls
Tiling

ESCALATORS

October 2018 to November 2018

 

Complete retro fit of escalator in existing shopping centre
Removal of concrete slabs
Tenant relocation
Structural and sundry steelwork
Glazing
Painting
Tiling

GYPSUM CALCINNING PLANT

 POTCHEFSTROOM April 2018 to November 2018 R10 000 000.00 Structural and Sundry Steelwork
Wet works
Concrete bases and plinths
Roof Sheeting
Painting
Co-ordination and design

CLUB 3 - ADVOCATES BUILDING

CLUB 3 - ADVOCATES BUILDING May 2018 to July 2018 R550 000.00 Structural and Sundry Steelwork
Pergola Structure
Composite Decking
tiling
Stainless Steel Handrails
Bar Construction

NEWTOWN

NEWTOWN - MCDONALDS LED SCREEN

CLUB 5 - CARPORTS

June 2018
 


December 2017

R75 642.00



R697 594.00
Structural and Sundry Steelwork
Painting
 

Structural and Sundry Steelwork
Roof Sheeting
Solar Panel Steel Work

BUILDERS WAREHOUSE

BUILDERS WAREHOUSE GLENEAGLES October 2017 to January 2018 R938 918.00 Structural and Sundry Steelwork
Sliding Stacking Gates
Assistance with design of gates

GENOCIDE AND HOLOCAUST CENTRE

GENOCIDE AND HOLOCAUST CENTRE October 2017 to November 2017 R192 000.00 Structural and Sundry Steelwork
Decorative and Architectural Steelwork

HILLSIDE OFFICES

HILLSIDE OFFICES - NEW SOFT ROOF May 2018 R400 000.00 Structural and Sundry Steelwork
Roof Sheeting
Painting

MALL OF AFRICA

MALL OF AFRICA - LGC TRIBECA ROOFS August 201 7 R612 648.00 Structural and Sundry Steelwork
Feature Steel Roof Structure
Specialised Roof Covering
Waterproofing
Painting

MAPONYA DEVELOPMENT

MAPONYA DEVELOPMENT

EXTERNAL WORKS

 

TIGER WHEEL AND TYRE

 

 

BP FILLING STATION

August 2017 to December 2017  

R7 394 566.00

 

R4 987 161.00

 

 

R6 213 470.00

 

Earthworks
Landscaping
Road Works

Wet works
Shopfitting and Finishes
Structural and Sundry Steelwork
Painting
Tiling

External works
Structural and Sundry Steelwork
Painting
Tiling

DUNES MALL

DUNES MALL - CHAMELEON November 2017 R183 429.00 Sundry Steelwork
Playground feature
Exportation Logistics

MOOIRIVIER MALL

MOOIRIVIER MALL - MILADY'S / MR PRICE June 2017 to October 2017 R4 449 465.00 Strip out existing tenant installation
Re-construct to new tenants specifications
Glazing
Painting
Bulkheads/Drywalls
Tiling
Shopfitting and Finishes
High level fire rated demising walls
(All work completed during trading hours_

CITY MALL

CITY MALL - WOOLWORTHS June 2017 to July 2017 R388 359.00 Strip out existing tenant installation
Re-construct to tenants specifications
Glazing
Painting
Bulkheads/Drywalls
Tiling
Shopfitting and Finishes
(All work completed during trading hours_
 
75 GREYSTON AVE May 2017 to July 2017 R919 436.00 Removal of existing Structure
Installation of new steel skylight
Glazing
Bulkheads
Paintwork
 
HILLSIDE OFFICES April 2016 to October 2016 R541 677.00 Structural and Stundry Steelwork
Louvre Support
Painting
 
TIGER WHEEL AND TYRE KLERKSDORP September 2016 to December 2016 R6 945 960.00 Wet Works
Shopfitting and Finishes
Structural and Sundry Steelwork
External Works / Road Works
Landscaping
Painting
Tiling
 
NEWTOWN JUNCTION - NEDBANK SUNSCREENS September 2016 to October 2016 R1 188 444.00 Installation of Structural Steel Louvre Supports
Working on heights without lifting equipment against
Nedbank Facade / Limited access
Painting
 
BELA-BELA WILDS WINKEL February 2016 to June 2016 R9 065 000.00 Wet Works
Shopfitting and Finishes
Structural and Sundry Steelwork
 
AUTO PEDIGREE
SPARTAN
February 2016 to May 2016 R1 500 000.00 All Civil & Wet Works
Structural Steel Work
 
RENAULT SPARTAN  June 2015 to Oct-15  R 3 813 033.00  All Civil & Wet Works
Structural Steel Work
 
BURGER KING
POTCHEFSTROOM

 

 

 

August 2015 to
November 2015

 

 

 

R 7 500 000.00

 

 

 

All Consulting and Contracting Services
Wet Works
Shopfitting & Finishes
Structural Steelwork

 

 
VALUE CENTRE
FLAMWOOD WALK  

 

 

 

 
April 2015 to
December 2015

 

 

 

 
R 40 400 935.00

 

 

 

 
Co-ordination and Project Management
Wet Works
Shopfitting & Finishes
Ceilings and Partitions
Structural & Sundry Steel Work

 

 
FLAMWOOD WALK  
SHOPPING CENTRE 

 

 

 

 
October 2014 to
October 2015

 

 

 

 
R 147 988 000.00

 

 

 

 
Co-ordination and Project Management
Wet Works
Shopfitting & Finishes
Ceilings and Partitions
Structural & Sundry Steel Work

 

 
TOWER MALL 
SHOPPING CENTRE 

 

 

 

October 2013 to
October 2014

 

 

 

R 115 944 232.00

 

 

 

Co-ordination and Project Management
Wet Works
External Works
Structural & Sundry Steel Work

 

 
POTATO SHED NEWTOWN
SHOPPING CENTRE 
September 2013 to
November 2014

 

R 11 910 400.00

 

 Structural & Sundry Steel Work
 
TILE AFRICA
FLAMWOOD WALK

 

 

 

November 2012 to
May 2013

 

 

 

R 3 562 958.00

 

 

 

Co-ordination and Project Management
Wet Works
External Works
Structural & Sundry Steel Work

 

 
MPONENG MINE
CARLETONVILLE
August 2012 to
January 2013
R 1,650,000.00 Construct bases and concrete structure for
Shot Blast Machine installation complete
with Steelwork and Cladding.
 
SAVUKA MINE
CARLETONVILLE

 

 
August 2012
to February 2013

 

 
R 5,300,000.00

 

 

 

Do method statement for the rehabilitation of
an existing concrete structure and achieve
the tender to carry out the contract.
 
PALM SPRINGS
SHOPPING CENTRE

ORANGE FARM VEREENIGING

July 2012
TO November 2012

 

 

 

R 650,000.00

 

 

 

 
Steelwork installation for the extension of an
existing concrete structure and achieve the
tender to carry out the contract.
 
THE AVENUES
SPRINGS
May 2012 to June
2012 
R 450,000.00

 

Take off existing skylights, re-design and install
new skylights complete.
 
RIVER SQUARE MALL
VEREENIGING

 

 
February 2012 to
April 2012

 

 
R 530,000.00

 

 

 

Strip out existing tenant installation, re-construct
and install new tenant installation complete for
Shopfitting.
 
MEDI CLINIC REVAMP

VEREENIGING

 
February 2012 to

May 2012

 
R 1,200,000.00

 

 
Revamp and improve faįade details, Install new features,

service roofs, paintwork to existing buildings.

 
 
ANGLOGOLD ASHANTI

PROJECTS:

* Sulphur Paydam 

* Valve Store Kopanang

* New Oil Store Moab Mine

 

* Atds Training Centre

 

 
 

2011- 2012

 

 

 

 

 

 

 
 

 

R 963 556.00

R 282 359.00

R 569 533.00

 

R 585 492.00

 

 
 

 

Structural  Steelwork

Structural  Steelwork

Structural  Steelwork

Concrete / Brick/ Form Work

Structural  Steelwork

Concrete / Brick/ Form Work

 
 
MOAB KHOTSONG 

MINE

 
December 2011 

to June 2012

 
R 2,800,000.00

 

 
Demolish Old Compressor Base- Construct New Base,

Construct Cooling Dam for Cooling Towers

 
 
DISCHEM 

FLAMWOOD SHOPPING 

CENTRE KLERKSDORP

 

November 2011

to March 2012

 

 

R 1,500,000.00

 

 

 

Strip out existing Tenant Installation, re-construction and

install new Tenant Installation, Complete for Shop fitting.

 

 

 
THE HUB AND POST 

OFFICE INSTALLATION

KLERKSDORP CITY MALL

 

November 2011

to March 2012

 

 

R 4,850,000.00

 

 

 

Strip out existing Tenant Installation, re-construction and

install new Tenant Installation, Complete for Shop fitting.

 

 

 
G. S. POULTRY

KLERKSDORP

 

 

 
April 2011 to

July 2011

 

 

 
R 4,155,823.00

 

 

 

 
Demolitions, new concrete & wet works

Ceiling & Partitions

Structural & Sundry Steelwork, Cladding

 

 
 
MATLOSANA

INDUSTRIES-

ORKNEY

 

 
April 2011 to 

August 2011

 

 

 
R 2,748,000.00

 

 

 

 
2000mē Steelwork warehouse 

Sheeting & Cladding

Civil & Concrete work

Wet Works

 
 
NEWPARK

SHOPPING CENTRE

KIMBERLEY

 

 
February 2011 to 

July 2011

 

 

 
R 423,822.16

 

 

 

 
Structural Steelwork,

Installation of Conveyors & staircases

Palisade Fencing

 

 
 
BEDWORTH SHOPPING

CENTRE

VEREENIGING

 

 
June 2011 to 

September 2011

 

 

 
R 947,328.27

 

 

 

 
35 Tons of structural roof steelwork

Canopies and sundry steelwork

 

 

 
 
ONCOLOGY UNIT

NATIONAL HOSPITAL

BLOEMFONTEIN

 

 

 

September 2010 to

April 2011

 

 

 

 

R 12,902,000.00

 

 

 

 

 

Bulk Earthworks & Tar road access

Oncology  Rooms (262 mē)

Renovation to Exicting(1200mē)

Paving & site work

Dry walling, ceilings, shop fitting

Structural & Sundry steelwork

 
OFFICE BLOCK 

KLERKSDORP

 

 

 

 

 
April 2010 to

December 2010

 

 

 

 

R 3,500,000.00

 

 

 

 

 

 
Design & Planning

Entire construction

Landscaping & Paving 

Ceiling & Partitions

Steel Roofs, Gates, Fencing  & 

Sundry Steelwork

 
 
CAPITEC BANK

CITY MALL

KLERKSDORP

 

 

 

January 2010 to

February 2010

 

 

 

 

53 874.98

 

 

 

 

 

Re- instate shop 111 

Ceiling & Partitions

New floor finishes

 

 

 

 
SPEEDY 4 X 4 , PHASE 2

KLERKSDORP

 

 

May  2010 to

August 2010

 

 

R 3,525,441.00

 

 

 

Structural steelwork, sheeting & cladding

Building & concrete work 

 

 

 
CLEARWATER MALL

RANDBURG

 

 

March 2010 to

November 2010

 

 

R 978,060.00

 

 

 

Dismantling of existing steelwork and carting away.

Removal of canopies and re-erect in new position.

 

 

 
PEPKOR CITY MALL

KLERKSDORP

 

 

Lem Group Header 2011a.jpg
January 2010  to

March 2010

 

 

 
R962 828.17

 

 

 

 
Removal of shopfronts, ceiling, brickwork

Installation of new ceilings, shopfronts

Plaster & brick Work

 

 
 
NW MUSICON

KLERKSDORP

 

 

January 2010 to 

February 2010

 

 

R194 300.00

 

 

 

Completion of music rooms

 

 

 

 
GOLDFIELDS MALL

WELKOM

 

 

January 2010 to

November 2010

 

 

R 12,174,516.63

 

 

 

Structural roof steelwork

Skylights and food courts

Sundry Steelwork

Decorative steelwork

 
WOODLANDS MALL

PRETORIA

 

 

 

 

January 2010 to

October 2010

 

 

 

 

R 5,476,865.00

 

 

 

 

 

Structural roof steelwork

Entrance features

Decorative steelwork

Food court canopies

Sliding gates, palisade, fencing.

 

 
SPEEDY 4 X 4 
KLERKSDORP

 

 

 

May 2009 to

December 2009

 

 

 
R 20,950,393.00

 

 

 

 
Pile Caps 

Concrete & Brickwork & Paving

Hardened Floors, ceiling & partitions

Structural & Sundry Steelwork

 
 
TERMINUS CENTRE,

KLERKSDORP

 

 

December 2009

to June 2010

 

 

R 3,480,000.00

 

 

 

Ceiling & Partitions

Structural roof steel

Canopies and decorative steel

Palisades, gates, stairs, cages, screens.

 
MIKES KITCHEN

 

 

 

 
January 2010 to

January 2010

 

 

 
R160 149.20

 

 

 

 
RENOVATIONS AND MOVE

Plaster work

Ceiling & Partitions

Carpentry & joinery

 
 
INCREDIBLE CONNECTION

VALUE CENTRE

KLERKSDORP

 

June 2009 to

July 2009

 

 

R 43,992.60

 

 

 

Renovation on old Hi- Fi Corporation building

Extention on Canopy, laminated beams

Kerb, paving & bollards.

 

 
AUTO RAMA

KLERKSDORP

September 2009 to

October 2009

R 14,519.33

 

Removal of roof structure

 

 
CHECKERS HYPER
KLERKSDORP

 
April 2009 to

May 2009

 

R 87,780.00 Removal of Pylon
 
ONCOLOGY UNIT

KLERKSDORP HOSPITAL

 

 

 

 

 

 

August 2008 to

April 2009

 

 

 

 

 

 

R 15,693,000.00

 

 

 

 

 

 

 

Bulk Earthworks

Concrete and wet works

Ceilings, partitions, joinery

Joinery

Steel Roof and sheeting.

Sundry steelwork

Bunker door

 

 
HANDY HOUSE

KLERKSDORP

 

 

June 2009 to

September 2009

 

 

R 1 250 000,00

 

 

 

Concrete and wet works

Warehouse steelwork, cladding

Sundry steelwork

 

 
KLERKSDORP CITY MALL

 

 

 

 

 

 

 

 

 

 
March 2008 to

August 2009

 

 

 

 

 

 

 

 

 
R 39,700,000.00

R 60,944,000.00

 

R 3,000,000.00

 

 

 

 

 

 

 
Parking Deck ( 21000mē)

Centre Addition (9000mē) 

Revamp old (15000mē)

Post Contract work

All concrete work, wet works

Bulkheads, ceilings, partitions

Shopfitting

Structural steelwork.

Shopfront supports

Sundry and decorative steelwork

 
 
PAMONA WAREHOUSE

JOHANNESBURG

 
July 2008  to

November 2008

 
R 6,264,808.00

 

 
Warehouse steelwork in excess of

200 tons in three months

 
 
TUSK  RIO CASINO

KLERKSDORP

 

 

 

 

2004

August 2008 to

December 2008

 

 

 

R 1,800,000.00

R 2,081,675.00

 

 

 

 

Phase 1 - Casino and Entertainment Centre      -

Structural steelwork, sundry steelwork

Phase 2 - Conference Centre and Hotel Facilities

Ceiling and Partitions in Conference Centre

Structural, decorative & Sundry Steelwork

 

 
MOOIRIVIER MALL

POTCHEFSTROOM

 

 

 
May 2007 

to August 2008

 

 

 
R 19,622,000.00

 

 

 

 
Shopping Centre steelwork 1000 tons

Structural roof steelwork

Sundry steelwork

Decorative steelwork

 
 
HYPERCAR

VEREENIGING

 

 

 
June 2007 to

February 2008

 

 

 
R 1,269,290.25

 

 

 

 
Concrete, formwork , Reinforcement

Carpentry & Joinery

Structural, Decorative Steelwork

Roof coverings

 
 
BEREA MOTORS

PRETORIA

 
August 2007 to

December 2007

 
R 297,540.00

 

 
Structural Steelwork 30 tons

Roof cladding

 
 
FLAMWOOD WALK 
VALUE CENTRE
KLERKSDORP

 
February 2007 to
October 2007
 
R 20,012,675.00 6000mē Shopping Centre
Concrete work, wet works, ceiling & partions
Internal work for Sportsmans Warehouse,
Hi-Fi Corporation and Fruit and Veg.
 
Structural , decorative& sundry Steelwork
 
 
MOAB KHOTSONG

MINE, 11 SHAFT

KLERKSDORP

 

 
2007

 

 

 

 
R 74,556.00

 

 

 

 
Store Bay Extention & Fencing

 

 

 

 
 
MICA

KLERKSDORP

 

 

 

 

January 2006 to

July 2006

 

 

 

 

R 3,200,000.00

 

 

 

 

 

Concrete& wet works

Ceiling & partitions

Parking area

Structural- decorative & sundry Steelwork

 

 

 
SPUR BEAR CREEK

KLERKSDORP

 

 

 
July 2006 to

December 2006

 

 

 
R 4,020,000.00

 

 

 

 
Concrete& wet works

Ceiling & partitions

Parking area

SPUR internal work

Structural,- decorative & sundry Steelwork

 

 
 
ROWLAND SHAFT

PHASE 1 ,RUSTENBURG

 

 

2006

 

 

 

R 1,000,000.00

 

 

 

Conveyor & underground Steelwork

 

 

 

 
DIAMOND PAVILION

KIMBERLEY

 
2006

 

 
1 250 000,00

 

 
Structural steel for roofs

 

 
 
KIMBERLEY 'GROOT GAT"

LOOKOUT POINT

 
August 2006 to

February 2007

 
R 1,800,000.00

 

 
Cable suspended steel Structure 

Stainless steel handrails

 
 
MOAB KHOTSONG

MINE, ORKNEY,11 SHAFT

 
2006

 

 
R 137,827.61

 

 
Dismantle  and re-erect Steel Core Shed

Concrete Slab 

 
 
WESTERN PLATINUM

RUSTENBURG

 
2006

 

 
R 370,925.50

 

 
Conveyor belt

 

 
 
CHANGE HOUSES

DRIEFONTEINE

ANGLOGOLD

ASHANTI

 

 

 June 2006 to

July 2007

 

 

 

 

R 9,635,337.87

 

 

 

 

 

Concrete & Building works

Ceilings and partitions

Tile work, benches

Structural steelwork , roof sheeting.

Sundry and decorative steelwork

 

 
JADE SQUARE

SHOWROOM AND OFFICES

KLERKSDORP

 

 

 

April 2006 to

March 2007

 

 

 

 

R 9,102,900.00

 

 

 

 

 

Civil & Concrete works

Wet works, Brick & Plaster 

Landscaping and paving 

Ceiling & partitions

Steel Roofs, gates, sundry steelwork

 

 
CTM VRYBURG May 2006 to

April 2007

 

R 4,466,078.98 Extension to existing CTM Warehouse

Brickwork, concrete work, finishes.

Structural Steel work, roof covering & 

Cladding, decorative and sundry steelwork.

 

 
CARGO MOTORS

POTCHEFSTROOM

 

 

 
May 2006 - October 2006

 

 

 

 
R741 000.00

 

 

 

 
Upgrading of existing dealership

Concrete- and wet works

Ceiling & partitions

Trusses and cladding

 
 
MUSICON

KLERKSDORP

 

 

 
April 2006 to

December 2006

 

 

 
R1 500 000.00

 

 

 

 
New  Musicon Building

Brickwork , plastering & paving

Ceiling & partitions

Structural & Sundry Steelwork

 
 
KOPANONG MINE NO 9

 

2005

 

R 35,502.93

 

Sliding  doors & Gates

 

 
PICK AND PAY

PHASE 2, KLERKSDORP

 

 

 
March 2005 to

February 2006

 

 

 
R9 968 354.21

 

 

 

 
Piling, concrete work, wet works.

Ceilings and partitions

Finishes

Decorative & Sundry Steelwork

 
 
CARGO MOTORS

KLERKSDORP

 

 

 

 

August  2005 to

May 2006

 

 

 

 

R 20,117,648.00

 

 

 

 

 

 Concrete and wet works

Hardened floors

Ceilings, partitions and finishes

Decorative & Sundry Steelwork

Handrails

 

 
SCHOONSPRUIT 

HIGH SCHOOL

KLERKSDORP

 

February 2005 to

May 2005

 

 

R776 723.24

 

 

 

Internal finishes

Replace roof trusses

Replace roof sheeting

 

 
DR J.P. VAN DER WALT

 

 

 

 

 

 

 

May 2005 to

October 2005

 

 

 

 

 

 

R1 145 430.96

 

 

 

 

 

 

 

Renovation / additions to consulting rooms

Concrete work, wet works

Ceilings and partitions

Finishes

Curved roof steelwork

Cladding

Decorative steelwork

 

 
LA PROVANCE HOUSE

 FOR MR. E. SENEKAL

 

 

June 2005 to

May 2006

 

 

R1 098 270

 

 
Foundations

Suspended slabs

Brickwork

 

 
FLAMWOOD PHASE 5

STANDARD BANK PHASE

 

 

 
January 2005 to

August 2005

 

 

 
R17 427 655.80

 

 

 

 
Concrete and wet works, basement & 2 floors

Civil Works

Internal Finishes

Structural steelwork and cladding

Decorative and sundry steelwork
 
MAFIKENG THE CROSSING

SHOPPING CENTRE

Assisting Ludick 

Builders and WGK Steel

Bloemfontein
August 2004 to

August 2005

 

 

 
R56 000 000,00

 

 

 

 
Concrete works

Wet works

Project Management

Roof steel, sundry, decorative steel.

 
 
MOAB KHOTSONG MINE

11 SHAFT, ORKNEY

 

 

 

 

 

 

2005

 

 

 

 

 

 
R 571,039.82

 

 

 

 

 

 
Booster, Bed frame & re- enforcing

Vent Louvre

Light Mass Platform

Underground Storage rocks

Penthouse

Stairs & Handrails

Penthouse  Platform 

Farm Gates

 
MOAB KHOTSONG MINE

11 SHAFT, ORKNEY

 

 

 

 

 

 

 
2004

 

 

 

 

 

 

 

 
R 862,074.23

 

 

 

 

 

 

 

 
Concrete Beam

76 level wall slinging boom 

80 level Main shaft deepening

Boxfront

Farmgates

Drumplates

Pipe Support

IMS lock-up Cubical

Inspection carrage
 
WEST WITS MINES

CARLETONVILLE

 

 

 
2004

 

 

 

 
R 1,421,599.88

 

 

 

 
RH, Incline Shaft

IMS Handrails

 

 

 
 
GREAT NOLIGWA MINES

SHAFT NO8, RUSTENBURG

 

 

2004

 

 

 

R 979,485.59

 

 

 

Flask complete with liners

Boxfronts 

 

 

 
HOSSY SHAFT 

RUSTENBURG

 

 

2004

 

 

 

R 1,230,497.92

 

 

 

Winder house Steel Construction 

 

 

 

 
SAFFY SHAFT

RUSTENBURG

2004

 

R 1,118,796.10

 

Change houses - Steelwork

 

 
MOAB KHOTSONG MINE
11 SHAFT, ORKNEY

 
2003 R 651,292.45 Loading Station Grating & staircases

Cooling coil Slinging Basket

Concrete kettle & louder

Trolley Baskets

Screens

Concrete Slab

Fencing

 

 
KOPANONG MINE

SHAFT 9,RUSTENBURG

 

 

2003

 

 

 

R 868,117.07

 

Adjustable Pipe Brackets 

Fencing

 

 

 
LONMIN PLATINUM K4

RUSTENBURG

 

 

 

 

 

 

 

 

 

 

 

 

2002-2006

 

 

 

 

 

 

 

 

 

 

 

 

 

R 1,677,920.91

 

 

 

 

 

 

 

 

 

 

 

 

 

Level posts & screens

Tip doors counter weights

Vertical settlers for underflow piping 

 Level lifting brackets

 Settlers valve access platform

Settlers support 

Launder Frame With vent seal doors

Sub-station Doors 

Explosive Shed

Boxfront Screens

Vent coverplates

Conveyorbelt, Steelwork

 

 

 
WEST WITS MINE

CARLETONVILLE

 
2001

 

 
R 1,557,032.23

 

 
Jumper cars

Drill steel cars 

Boxfronts