PROJECT DURATION VALUE  LEM GROUP PARTICIPATION DESCRIPTION
RENAULT SPARTAN  June 2015 to Oct-15  R 3 813 033.00  Ludick Construction: 

Braam's Staal:                    

 
All Civil & Wet Works

Structural Steel Work

BURGER KING
POTCHEFSTROOM

 

 

 

August 2015 to
November 2015

 

 

 

R 7 500 000.00

 

 

 

Lem Group:    

Ludick Construction:      

 

Braam's Staal:                     

 
All Consulting and Contracting Services

Wet Works

Shopfitting & Finishes

Structural Steelwork

 
VALUE CENTRE
FLAMWOOD WALK  

 

 

 

 
April 2015 to
December 2015

 

 

 

 
R 40 400 935.00

 

 

 

 
Lem Group:    

Ludick Construction:       

 

 

Braam's Staal:                     

 

Co-ordination and Project Management

Wet Works

Shopfitting & Finishes

Ceilings and Partitions

Structural & Sundry Steel Work

 

FLAMWOOD WALK  
SHOPPING CENTRE 

 

 

 

 
October 2014 to
October 2015

 

 

 

 
R 147 988 000.00

 

 

 

 
Lem Group:    

Ludick Construction:      

 

 

Braam's Staal:               

 

Co-ordination and Project Management

Wet Works

Shopfitting & Finishes

Ceilings and Partitions

Structural & Sundry Steel Work

 

TOWER MALL 
SHOPPING CENTRE 

 

 

 

October 2013 to
October 2014

 

 

 

R 115 944 232.00

 

 

 

Lem Group:    

Ludick Construction:      

 

Braam's Staal:                     

 
Co-ordination and Project Management

Wet Works

External Works

Structural & Sundry Steel Work

 
POTATO SHED NEWTOWN
SHOPPING CENTRE 
September 2013 to
November 2014

 

R 11 910 400.00

 

Braam's Staal:                       Structural & Sundry Steel Work
TILE AFRICA
FLAMWOOD WALK

 

 

 

November 2012 to
May 2013

 

 

 

R 3 562 958.00

 

 

 

Lem Group:    

Ludick Construction:     

                                                    

Braam's Staal:                    

 
Co-ordination and Project Management

Wet Works

External Works

Structural & Sundry Steel Work

 
MPONENG MINE
CARLETONVILLE
August 2012 to
January 2013
R 1,650,000.00 Lem Group:   Construct bases and concrete structure for
Shot Blast Machine installation complete
with Steelwork and Cladding.
SAVUKA MINE
CARLETONVILLE

 

 
August 2012
to February 2013

 

 
R 5,300,000.00

 

 

 

Lem Group:

 

 

 

Do method statement for the rehabilitation of
an existing concrete structure and achieve
the tender to carry out the contract.
PALM SPRINGS
SHOPPING CENTRE

ORANGE FARM VEREENIGING

July 2012
TO November 2012

 

 

 

R 650,000.00

 

 

 

 
Lem Group:

 

 

 

 
Steelwork installation for the extension of an
existing concrete structure and achieve the
tender to carry out the contract.
THE AVENUES
SPRINGS
May 2012 to June
2012 
R 450,000.00

 

Lem Group:

 

Take off existing skylights, re-design and install
new skylights complete.
RIVER SQUARE MALL
VEREENIGING

 

 
February 2012 to
April 2012

 

 
R 530,000.00

 

 

 

Lem Group:

 

 

 

Strip out existing tenant installation, re-construct
and install new tenant installation complete for
Shopfitting.
MEDI CLINIC REVAMP

VEREENIGING

 
February 2012 to

May 2012

 
R 1,200,000.00

 

 
Lem Group:

 

 
Revamp and improve faįade details, Install new features,

service roofs, paintwork to existing buildings.

 
ANGLOGOLD ASHANTI

PROJECTS:

* Sulphur Paydam 

* Valve Store Kopanang

* New Oil Store Moab Mine

 

* Atds Training Centre

 

 
 

2011- 2012

 

 

 

 

 

 

 
 

 

R 963 556.00

R 282 359.00

R 569 533.00

 

R 585 492.00

 

 
 

 

Braam's Staal:            

Braam's Staal:                      

Braam's Staal:                     

 

Braam's Staal:                       

                                                    

 
 

 

Structural  Steelwork

Structural  Steelwork

Structural  Steelwork

Concrete / Brick/ Form Work

Structural  Steelwork

Concrete / Brick/ Form Work

 
MOAB KHOTSONG 

MINE

 
December 2011 

to June 2012

 
R 2,800,000.00

 

 
Lem Group:

 

 
Demolish Old Compressor Base- Construct New Base,

Construct Cooling Dam for Cooling Towers

 
DISCHEM 

FLAMWOOD SHOPPING 

CENTRE KLERKSDORP

 

November 2011

to March 2012

 

 

R 1,500,000.00

 

 

 

Lem Group:

 

 

 

Strip out existing Tenant Installation, re-construction and

install new Tenant Installation, Complete for Shop fitting.

 

 

THE HUB AND POST 

OFFICE INSTALLATION

KLERKSDORP CITY MALL

 

November 2011

to March 2012

 

 

R 4,850,000.00

 

 

 

Lem Group:

 

 

 

Strip out existing Tenant Installation, re-construction and

install new Tenant Installation, Complete for Shop fitting.

 

 

G. S. POULTRY

KLERKSDORP

 

 

 
April 2011 to

July 2011

 

 

 
R 4,155,823.00

 

 

 

 
Ludick Construction:             

                           

Braam Staal:

 

 
Demolitions, new concrete & wet works

Ceiling & Partitions

Structural & Sundry Steelwork, Cladding

 

 
MATLOSANA

INDUSTRIES-

ORKNEY

 

 
April 2011 to 

August 2011

 

 

 
R 2,748,000.00

 

 

 

 
Braam Staal: 

 

Ludick Construction:          

                            

 
2000mē Steelwork warehouse 

Sheeting & Cladding

Civil & Concrete work

Wet Works

 
NEWPARK

SHOPPING CENTRE

KIMBERLEY

 

 
February 2011 to 

July 2011

 

 

 
R 423,822.16

 

 

 

 
Braam Staal: 

 

 

 

 
Structural Steelwork,

Installation of Conveyors & staircases

Palisade Fencing

 

 
BEDWORTH SHOPPING

CENTRE

VEREENIGING

 

 
June 2011 to 

September 2011

 

 

 
R 947,328.27

 

 

 

 
Braam Staal:      

 

 

 

 
35 Tons of structural roof steelwork

Canopies and sundry steelwork

 

 

 
ONCOLOGY UNIT

NATIONAL HOSPITAL

BLOEMFONTEIN

 

 

 

September 2010 to

April 2011

 

 

 

 

R 12,902,000.00

 

 

 

 

 

Ludick Construction:                  

 

 

 

 

Braam Staal:     

Bulk Earthworks & Tar road access

Oncology  Rooms (262 mē)

Renovation to Exicting(1200mē)

Paving & site work

Dry walling, ceilings, shop fitting

Structural & Sundry steelwork

OFFICE BLOCK 

KLERKSDORP

 

 

 

 

 
April 2010 to

December 2010

 

 

 

 

R 3,500,000.00

 

 

 

 

 

 
Ludick Construction:               

 

 

 

Braam Staal: 

 

 
Design & Planning

Entire construction

Landscaping & Paving 

Ceiling & Partitions

Steel Roofs, Gates, Fencing  & 

Sundry Steelwork

 
CAPITEC BANK

CITY MALL

KLERKSDORP

 

 

 

January 2010 to

February 2010

 

 

 

 

53 874.98

 

 

 

 

 

 

Ludick Construction:                

 

 

 

 

Re- instate shop 111 

Ceiling & Partitions

New floor finishes

 

 

 

SPEEDY 4 X 4 , PHASE 2

KLERKSDORP

 

 

May  2010 to

August 2010

 

 

R 3,525,441.00

 

 

 

Braam Staal:

Ludick Construction:             

 

 

Structural steelwork, sheeting & cladding

Building & concrete work 

 

 

CLEARWATER MALL

RANDBURG

 

 

March 2010 to

November 2010

 

 

R 978,060.00

 

 

 

Lem Group:

 

 

 

Dismantling of existing steelwork and carting away.

Removal of canopies and re-erect in new position.

 

 

PEPKOR CITY MALL

KLERKSDORP

 

 

Lem Group Header 2011a.jpg
January 2010  to

March 2010

 

 

 
R962 828.17

 

 

 

 
Ludick Construction:

 

 

 

 
Removal of shopfronts, ceiling, brickwork

Installation of new ceilings, shopfronts

Plaster & brick Work

 

 
NW MUSICON

KLERKSDORP

 

 

January 2010 to 

February 2010

 

 

R194 300.00

 

 

 

Ludick Construction:

 

 

 

Completion of music rooms

 

 

 

GOLDFIELDS MALL

WELKOM

 

 

January 2010 to

November 2010

 

 

R 12,174,516.63

 

 

 

Braam Staal:

               

 

 

Structural roof steelwork

Skylights and food courts

Sundry Steelwork

Decorative steelwork

WOODLANDS MALL

PRETORIA

 

 

 

 

January 2010 to

October 2010

 

 

 

 

R 5,476,865.00

 

 

 

 

 

Braam Staal:

 

 

 

 

 

Structural roof steelwork

Entrance features

Decorative steelwork

Food court canopies

Sliding gates, palisade, fencing.

 

SPEEDY 4 X 4 
KLERKSDORP

 

 

 

May 2009 to

December 2009

 

 

 
R 20,950,393.00

 

 

 

 
Ludick Construction:     

 

 

Braam Staal:   

 
Pile Caps 

Concrete & Brickwork & Paving

Hardened Floors, ceiling & partitions

Structural & Sundry Steelwork

 
TERMINUS CENTRE,

KLERKSDORP

 

 

December 2009

to June 2010

 

 

R 3,480,000.00

 

 

 

Ludick Construction:              

Braam Staal:      

 

 

Ceiling & Partitions

Structural roof steel

Canopies and decorative steel

Palisades, gates, stairs, cages, screens.

MIKES KITCHEN

 

 

 

 
January 2010 to

January 2010

 

 

 
R160 149.20

 

 

 

 
 

Ludick Construction:               

 

 

 
RENOVATIONS AND MOVE

Plaster work

Ceiling & Partitions

Carpentry & joinery

 
INCREDIBLE CONNECTION

VALUE CENTRE

KLERKSDORP

 

June 2009 to

July 2009

 

 

R 43,992.60

 

 

 

 

Braam Staal:

Ludick Construction:      

 

Renovation on old Hi- Fi Corporation building

Extention on Canopy, laminated beams

Kerb, paving & bollards.

 

AUTO RAMA

KLERKSDORP

September 2009 to

October 2009

R 14,519.33

 

Braam Staal:      

 

Removal of roof structure

 

CHECKERS HYPER
KLERKSDORP

 
April 2009 to

May 2009

 

R 87,780.00 Braam Staal: Removal of Pylon
ONCOLOGY UNIT

KLERKSDORP HOSPITAL

 

 

 

 

 

 

August 2008 to

April 2009

 

 

 

 

 

 

R 15,693,000.00

 

 

 

 

 

 

 

Ludick Construction:                        

 

 

 

Braam Staal:              

 

 

 

Bulk Earthworks

Concrete and wet works

Ceilings, partitions, joinery

Joinery

Steel Roof and sheeting.

Sundry steelwork

Bunker door

 

HANDY HOUSE

KLERKSDORP

 

 

June 2009 to

September 2009

 

 

R 1 250 000,00

 

 

 

Ludick  Construction:                        

Braam Staal:              

 

 

Concrete and wet works

Warehouse steelwork, cladding

Sundry steelwork

 

KLERKSDORP CITY MALL

 

 

 

 

 

 

 

 

 

 
March 2008 to

August 2009

 

 

 

 

 

 

 

 

 
R 39,700,000.00

R 60,944,000.00

 

R 3,000,000.00

 

 

 

 

 

 

 
 

 

 

 

Ludick Construction:                   

 

 

Braam Staal:             

 

 

 
Parking Deck ( 21000mē)

Centre Addition (9000mē) 

Revamp old (15000mē)

Post Contract work

All concrete work, wet works

Bulkheads, ceilings, partitions

Shopfitting

Structural steelwork.

Shopfront supports

Sundry and decorative steelwork

 
PAMONA WAREHOUSE

JOHANNESBURG

 
July 2008  to

November 2008

 
R 6,264,808.00

 

 
Braam Staal:            

 

 
Warehouse steelwork in excess of

200 tons in three months

 
TUSK  RIO CASINO

KLERKSDORP

 

 

 

 

2004

August 2008 to

December 2008

 

 

 

R 1,800,000.00

R 2,081,675.00

 

 

 

 

 

Braam Steel:

 

Ludick Construction:            

Braam Steel:

 

Phase 1          - Casino & Entertainment Centre

Structural steelwork, sundry steelwork

Phase 2          - Conference Centre and Hotel Facilities

Ceiling and Partitions in Conference Centre

Structural, decorative & Sundry Steelwork

 

MOOIRIVIER MALL

POTCHEFSTROOM

 

 

 
May 2007 

to August 2008

 

 

 
R 19,622,000.00

 

 

 

 
Braam Steel:   

 

 

 

 
Shopping Centre steelwork 1000 tons

Structural roof steelwork

Sundry steelwork

Decorative steelwork

 
HYPERCAR

VEREENIGING

 

 

 
June 2007 to

February 2008

 

 

 
R 1,269,290.25

 

 

 

 
Ludick Construction:          

                               

Braam Staal:   

                                 

 
Concrete, formwork , Reinforcement

Carpentry & Joinery

Structural, Decorative Steelwork

Roof coverings

 
BEREA MOTORS

PRETORIA

 
August 2007 to

December 2007

 
R 297,540.00

 

 
Braam Staal:            

                                          

 
Structural Steelwork 30 tons

Roof cladding

 
FLAMWOOD WALK 
VALUE CENTRE
KLERKSDORP

 
February 2007 to
October 2007
 
R 20,012,675.00 Ludick Construction:          
                                
                             
                             

Braam Staal: 
 
6000mē Shopping Centre
Concrete work, wet works, ceiling & partions
Internal work for Sportsmans Warehouse,
Hi-Fi Corporation and Fruit and Veg.
 
Structural , decorative& sundry Steelwork
 
MOAB KHOTSONG

MINE, 11 SHAFT

KLERKSDORP

 

 
2007

 

 

 

 
R 74,556.00

 

 

 

 
Braam Staal:  

 

 

 

 
Store Bay Extention & Fencing

 

 

 

 
MICA

KLERKSDORP

 

 

 

 

January 2006 to

July 2006

 

 

 

 

R 3,200,000.00

 

 

 

 

 

Ludick Construction:      

 

 

Braam Staal:

 

 

Concrete& wet works

Ceiling & partitions

Parking area

Structural- decorative & sundry Steelwork

 

 

SPUR BEAR CREEK

KLERKSDORP

 

 

 
July 2006 to

December 2006

 

 

 
R 4,020,000.00

 

 

 

 
Ludick Construction:         

 





Braam Staal:   
 

 

Concrete& wet works

Ceiling & partitions

Parking area

SPUR internal work

Structural,- decorative & sundry Steelwork

 

 
ROWLAND SHAFT

PHASE 1 ,RUSTENBURG

 

 

2006

 

 

 

R 1,000,000.00

 

 

 

Braam Staal:   

 

 

 

Conveyor & underground Steelwork

 

 

 

DIAMOND PAVILION

KIMBERLEY

 
2006

 

 
1 250 000,00

 

 
Braam Staal:

 

 
Structural steel for roofs

 

 
KIMBERLEY 'GROOT GAT"

LOOKOUT POINT

 
August 2006 to

February 2007

 
R 1,800,000.00

 

 
Braam Staal:

 

 
Cable suspended steel Structure 

Stainless steel handrails

 
MOAB KHOTSONG

MINE, ORKNEY,11 SHAFT

 
2006

 

 
R 137,827.61

 

 
Braam Staal:

 

 
Dismantle  and re-erect Steel Core Shed

Concrete Slab 

 
WESTERN PLATINUM

RUSTENBURG

 
2006

 

 
R 370,925.50

 

 
Braam Staal:     

 

 
Conveyor belt

 

 
CHANGE HOUSES

DRIEFONTEINE

ANGLOGOLD

ASHANTI

 

 

 June 2006 to

July 2007

 

 

 

 

R 9,635,337.87

 

 

 

 

 

Ludick Construction:             

 

 

Braam Staal:   

 

 

Concrete & Building works

Ceilings and partitions

Tile work, benches

Structural steelwork , roof sheeting.

Sundry and decorative steelwork

 

JADE SQUARE

SHOWROOM AND OFFICES

KLERKSDORP

 

 

 

April 2006 to

March 2007

 

 

 

 

R 9,102,900.00

 

 

 

 

 

Ludick  Construction:      

 

 

 

Braam Staal:   

 

Civil & Concrete works

Wet works, Brick & Plaster 

Landscaping and paving 

Ceiling & partitions

Steel Roofs, gates, sundry steelwork

 

CTM VRYBURG May 2006 to

April 2007

 

R 4,466,078.98 Ludick Construction:             

Braam Staal: 

 

Extension to existing CTM Warehouse

Brickwork, concrete work, finishes.

Structural Steel work, roof covering & 

Cladding, decorative and sundry steelwork.

 

CARGO MOTORS

POTCHEFSTROOM

 

 

 
May 2006 - October 2006

 

 

 

 
R741 000.00

 

 

 

 
 

Ludick Construction:             

 

Braam Staal: 

 
Upgrading of existing dealership

Concrete- and wet works

Ceiling & partitions

Trusses and cladding

 
MUSICON

KLERKSDORP

 

 

 
April 2006 to

December 2006

 

 

 
R1 500 000.00

 

 

 

 
 

Ludick Construction:          

 

Braam Staal:

 
New  Musicon Building

Brickwork , plastering & paving

Ceiling & partitions

Structural & Sundry Steelwork

 
KOPANONG MINE NO 9

 

2005

 

R 35,502.93

 

Braam Staal:          

 

Sliding  doors & Gates

 

PICK AND PAY

PHASE 2, KLERKSDORP

 

 

 
March 2005 to

February 2006

 

 

 
R9 968 354.21

 

 

 

 
Ludick Construction:          

                             

 

Braam Staal:

 
Piling, concrete work, wet works.

Ceilings and partitions

Finishes

Decorative & Sundry Steelwork

 
CARGO MOTORS

KLERKSDORP

 

 

 

 

August  2005 to

May 2006

 

 

 

 

R 20,117,648.00

 

 

 

 

 

Ludick Construction:                

                                  

 

Braam Staal:    

 

 

 Concrete and wet works

Hardened floors

Ceilings, partitions and finishes

Decorative & Sundry Steelwork

Handrails

 

SCHOONSPRUIT 

HIGH SCHOOL

KLERKSDORP

 

February 2005 to

May 2005

 

 

R776 723.24

 

 

 

Ludick Construction:           

                              

Braam Staal:    

 

Internal finishes

Replace roof trusses

Replace roof sheeting

 

DR J.P. VAN DER WALT

 

 

 

 

 

 

 

May 2005 to

October 2005

 

 

 

 

 

 

R1 145 430.96

 

 

 

 

 

 

 

Ludick Construction:                

 

 

 

Braam Staal:    

 

 

 

Renovation / additions to consulting rooms

Concrete work, wet works

Ceilings and partitions

Finishes

Curved roof steelwork

Cladding

Decorative steelwork

 

LA PROVANCE HOUSE

 FOR MR. E. SENEKAL

 

 

June 2005 to

May 2006

 

 

R1 098 270

 

 
Ludick Construction:              

 

 

 

Foundations

Suspended slabs

Brickwork

 

FLAMWOOD PHASE 5

STANDARD BANK PHASE

 

 

 
January 2005 to

August 2005

 

 

 
R17 427 655.80

 

 

 

 
Ludick Construction:              

 

 

Braam Staal:     

                                  
Concrete and wet works, basement & 2 floors

Civil Works

Internal Finishes

Structural steelwork and cladding

Decorative and sundry steelwork
MAFIKENG THE CROSSING

SHOPPING CENTRE

Assisting Ludick 

Builders and WGK Steel

Bloemfontein
August 2004 to

August 2005

 

 

 
R56 000 000,00

 

 

 

 
Ludick Construction:                           

 

 

Braam Staal:                   

 
Concrete works

Wet works

Project Management

Roof steel, sundry, decorative steel.

 
MOAB KHOTSONG MINE

11 SHAFT, ORKNEY

 

 

 

 

 

 

2005

 

 

 

 

 

 
R 571,039.82

 

 

 

 

 

 
Various Projects:  Braam Staal

 

 

 

 

 

 
Booster, Bed frame & re- enforcing

Vent Louvre

Light Mass Platform

Underground Storage rocks

Penthouse

Stairs & Handrails

Penthouse  Platform 

Farm Gates

MOAB KHOTSONG MINE

11 SHAFT, ORKNEY

 

 

 

 

 

 

 
2004

 

 

 

 

 

 

 

 
R 862,074.23

 

 

 

 

 

 

 

 
Various Projects: Braam Staal 

 

 

 

 

 

 

 

 
Concrete Beam

76 level wall slinging boom 

80 level Main shaft deepening

Boxfront

Farmgates

Drumplates

Pipe Support

IMS lock-up Cubical

Inspection carrage
WEST WITS MINES

CARLETONVILLE

 

 

 
2004

 

 

 

 
R 1,421,599.88

 

 

 

 
Various Projects: Braam's Staal

 

 

 

 
RH, Incline Shaft

IMS Handrails

 

 

 
GREAT NOLIGWA MINES

SHAFT NO8, RUSTENBURG

 

 

2004

 

 

 

R 979,485.59

 

 

 

Various Projects:  Braam Staal 

 

 

 

Flask complete with liners

Boxfronts 

 

 

HOSSY SHAFT 

RUSTENBURG

 

 

2004

 

 

 

R 1,230,497.92

 

 

 

Braam Staal:        

 

 

 

Winder house Steel Construction 

 

 

 

SAFFY SHAFT

RUSTENBURG

2004

 

R 1,118,796.10

 

Braam Staal:                

 

Change houses - Steelwork

 

MOAB KHOTSONG MINE
11 SHAFT, ORKNEY

 
2003 R 651,292.45 Various Projects: Braam Staal  Loading Station Grating & staircases

Cooling coil Slinging Basket

Concrete kettle & louder

Trolley Baskets

Screens

Concrete Slab

Fencing

 

KOPANONG MINE

SHAFT 9,RUSTENBURG

 

 

2003

 

 

 

R 868,117.07

 

 Braam Staal:     

 

 

 

Adjustable Pipe Brackets 

Fencing

 

 

LONMIN PLATINUM K4

RUSTENBURG

 

 

 

 

 

 

 

 

 

 

 

 

2002-2006

 

 

 

 

 

 

 

 

 

 

 

 

 

R 1,677,920.91

 

 

 

 

 

 

 

 

 

 

 

 

 

Various Projects: Braam Staal 

 

 

 

 

 

 

 

 

 

 

 

 

 

Level posts & screens

Tip doors counter weights

Vertical settlers for underflow piping 

 Level lifting brackets

 Settlers valve access platform

Settlers support 

Launder Frame With vent seal doors

Sub-station Doors 

Explosive Shed

Boxfront Screens

Vent coverplates

Conveyorbelt, Steelwork

 

 

WEST WITS MINE

CARLETONVILLE

 
2001

 

 
R 1,557,032.23

 

 
Various Projects: Braam Staal

 

 
Jumper cars

Drill steel cars 

Boxfronts